This project, undertaken by Hefei Taisang Energy Technology Co., Ltd., is a 472.59kW rooftop distributed photovoltaic project for Shucheng Xingyou Machinery Manufacturing Co., Ltd., with an actual installed capacity of 472.59kWp. The project consists of two grid connection points; 801 590W Jinko modules; two 110kW, one 150kW, and one 50kW Sungrow inverters; and an actual installed capacity of 472.59kWp. It will save 470,000 kWh of electricity per year, contributing to global energy conservation and emission reduction.